ISCOM361 Supplier Quality Challenge – Incoming Receiving Inspection WEEK 2 Essay
Create a 10-slide visual presentation, with speakers’ notes, that outlines the components of a receiving inspection plan.
Select a commodity to use as your example. Possible commodities include:
· Electrical components used in smartphone assembly
· Bulk food products, such as grains and liquids
· Mechanical components for industrial tool manufacturing
· Wiring components used in aerospace manufacturing
· Textiles used in clothing manufacturing
ORDER A PLAGIARISM-FREE PAPER HERE
Develop a receiving inspection plan for suppliers of the selected commodity based on the following criteria:
· Newly sourced supplier
· Existing sourced supplier
Analyze why this criteria is important to the receiving inspection plan strategy.
Assess the critical inspection elements to be considered when developing the plan, including the following:
· Incoming lot inspections
· Sampling
· Frequency
· Lot containment
· Data management
· Special handling considerations
· Supplier notifications
· Disposition of non-conforming material
· Supplier returns
· Scrap
Include a process map of the incoming receiving inspection process.
ISCOM361 Supplier Quality Challenge – Incoming Receiving Inspection WEEK 2 Essay